Works Completed
- 2005-2017 Supply plumbers and Materials for Offshore Oil & Gas Rigs
- 2010-2017 Esso Supplementary Labour PSO – Pipeline Surveillance Offices
- 2010-2016 Gippsland Water ROS Channel Relining Works
- 2010-2016 700mm Pipeline Rehabilitation Project
- 2013-2016 Jemena Pipeline Rehabilitation Project
- 2014-2015 Esso New Maintenance/Administration Building
- 2015 DELWP Fire Works
- 2016 -2017 APA Civil Construction works Longford Compound.
- 2016-2017 CCE Pipeline Works
- 2016 LPG Pipeline Rehabilitation Project
- 2016 AFS/VIVA Pipeline Rehabilitation Projects
- 2016 SWOP Stage 2 Replacement
- 2016 -2017 NACAP Civil, Concrete and Security Works
- 2016 Logicam Pipeline Rehabilitation Works
- 2017 AFS Costco – Pipeline Rehabilitation Project
- 2017 ROS Rosedale Willung Replacement
- Construction In Progress Perry Road Pipelines Rehabilitation Esso/Viva
- Gippsland Water Peg 84,86,86 Siphon Upgrade
- Gippsland Water Peg 29,40,54 Siphon
LFD Kipper Mercury Removal (KMR) Project:
- Demolition, removal and relocation of existing Administration, Amenity Huts and Services at Longford Gas Plant
Truck Load Facility Longford Gas Plant:
- Bulk civil works
- Roads to and from the TLF enclosure (Loading Bay)
- Storm water drains for the roads and TLF enclosure
- Precast and cast in situ footings for the TLF enclosure, light poles, CCTV camera poles, pipe supports and other equipment
- Slab for the TLF Enclosure
- Precast and cast in situ pits for glycol spillage collection and electrical, instrumentation
- Telecommunication cables
- TLF enclosure & telecom shelter
- Equipment stands, light poles, CCTV poles and pipe supports
- TLF security fencing and protection bollards
- Trenching for piping and cabling
A/B Train LIP:
- Demolition of existing footings
- Construct 5 cast in situ concrete footings including scabbing construction
- Install chemical anchors and injection adhesive
GP2/3 Maintenance Workshop Extension Construction Works (External) Longford Gas Plant:
- Demolish existing boundary fence
- Barricade around existing septic system for protection from road traffic
- Clear site of vegetation, rubble and redundant foundations/underground drainage inlets, pits and drain pipes located to the north of the red fence line shall be removed
- Demolish and remove watering system
- Relocation of existing garden taps
- Relocation of existing gas bottle
- Proof roll, remove soft spots and backfill with compacted engineering fill as required