Works Completed

  • 2005-2017 Supply plumbers and Materials for Offshore Oil & Gas Rigs
  • 2010-2017 Esso Supplementary Labour PSO – Pipeline Surveillance Offices
  • 2010-2016 Gippsland Water ROS Channel Relining Works
  • 2010-2016 700mm Pipeline Rehabilitation Project
  • 2013-2016 Jemena Pipeline Rehabilitation Project
  • 2014-2015 Esso New Maintenance/Administration Building
  • 2015 DELWP Fire Works
  • 2016 -2017 APA Civil Construction works Longford Compound.
  • 2016-2017 CCE Pipeline Works
  • 2016 LPG Pipeline Rehabilitation Project
  • 2016 AFS/VIVA Pipeline Rehabilitation Projects
  • 2016 SWOP Stage 2 Replacement
  • 2016 -2017 NACAP Civil, Concrete and Security Works
  • 2016 Logicam Pipeline Rehabilitation Works
  • 2017 AFS Costco – Pipeline Rehabilitation Project
  • 2017 ROS Rosedale Willung Replacement
  • Construction In Progress Perry Road Pipelines Rehabilitation Esso/Viva
  • Gippsland Water Peg 84,86,86 Siphon Upgrade
  • Gippsland Water Peg 29,40,54 Siphon

LFD Kipper Mercury Removal (KMR) Project:

  • Demolition, removal and relocation of existing Administration, Amenity Huts and Services at Longford Gas Plant

Truck Load Facility Longford Gas Plant:

  • Bulk civil works
  • Roads to and from the TLF enclosure (Loading Bay)
  • Storm water drains for the roads and TLF enclosure
  • Precast and cast in situ footings for the TLF enclosure, light poles, CCTV camera poles, pipe supports and other equipment
  • Slab for the TLF Enclosure
  • Precast and cast in situ pits for glycol spillage collection and electrical, instrumentation
  • Telecommunication cables
  • TLF enclosure & telecom shelter
  • Equipment stands, light poles, CCTV poles and pipe supports
  • TLF security fencing and protection bollards
  • Trenching for piping and cabling

A/B Train LIP:

  • Demolition of existing footings
  • Construct 5 cast in situ concrete footings including scabbing construction
  • Install chemical anchors and injection adhesive

GP2/3 Maintenance Workshop Extension Construction Works (External) Longford Gas Plant:

  • Demolish existing boundary fence
  • Barricade around existing septic system for protection from road traffic
  • Clear site of vegetation, rubble and redundant foundations/underground drainage inlets, pits and drain pipes located to the north of the red fence line shall be removed
  • Demolish and remove watering system
  • Relocation of existing garden taps
  • Relocation of existing gas bottle
  • Proof roll, remove soft spots and backfill with compacted engineering fill as required